Regulation No.1 of 2006
Sub-section (1) of section 31 of the Electricity Act, 2003, provides that the State Government shall establish a State Load Despatch Center (SLDC). Sub-section (2) of the Section 31 provides that the said SLDC shall be operated by a Government company/authority/corporation constituted by or under any State Act and that until such company /authority /corporation is notified by the State Government, the State Transmission Utility (STU) shall operate the SLDC. The Government of AP notified in GO Ms.No.8 dated 17-01-2004 that the existing SLDC shall continue as SLDC and be operated by the Transmission Corporation of AP Ltd., being the STU, until the State Government establishes a Government company or any authority or corporation.
Section 32(3) of the Act provides for levy and collection of such fees and charges from the generating companies and licensees engaged in the intra-state transmission of electricity as may be specified by the State Commission.
In exercise of powers conferred under Section 181 (2) (g) read with Section 32(3) of the Electricity Act 2003 (36 of 2003) and all other powers enabling it in that behalf, the Andhra Pradesh Electricity Regulatory Commission hereby makes the following Regulation, namely:
i. This Regulation may be called the Andhra Pradesh Electricity Regulatory Commission (Levy and collection of fees and charges by State Load Despatch Centre) Regulation, 2006.
ii. This Regulation shall be applicable to all generating companies and licensees engaged in intra-state transmission of electricity in the State of Andhra Pradesh.
iii. This Regulation does not apply to stand-alone generators, franchisees, etc. not connected to the intra-state transmission network.
iv. This Regulation shall come into force on 1st April, 2007.
(a) “Act” means the Electricity Act, 2003 (36 of 2003);
(b) “Commission” means the Andhra Pradesh Electricity Regulatory Commission;
(c) “Licence” means a licence granted under Section 14 of the Act to transmit, or distribute electricity within the State of Andhra Pradesh and to undertake trading in electricity as an electricity trader;
(d) “Licensee” means a person granted a licence under Section 14 of the Act;
(e) “State” means the State of Andhra Pradesh;
(f) “SLDC” or “State Load Despatch Centre” means the centre established under sub-section (1) of section 31 of the Act;
(g) “User” means the generating companies, Distribution Licensees or Trading Licensees as the case may be who use the intra–state transmission network for the purpose of selling / procuring electricity.
Capital Cost (CC) (in Rs.)
Annual SLDC Fee (Rs/MW/p.a) =
Total Generation Capacity (MW)
where
Capital Cost (CC) for a given year shall be computed as follows:
r
CC (in Rs.)
= Investment x
1
1 -
(1+ r)t
Where,
Investment = Actual investment made in an year plus any residual value of previous investment (s).
r = Actual rate of interest on borrowed capital or 150% of the Bank Rate, whichever is the lower.
t = Number of years in which the investment is proposed to be recovered; for software, it would be 5 years and 10 years for other investments.
a) Employee cost;
b) Administration and general charges;
c) Repairs and Maintenance expenses; and
d) Any other relevant costs and expenses deemed appropriate by the Commission.
The employee cost to be considered for the year shall be as per the approved staffing plan or the actual employee cost, whichever is lower. As a first step, SLDC shall file the staffing plan within three months from the date of notification of this Regulation. The Commission will approve the staffing plan after examining the details thereof. The approval shall be for the purpose of cost recovery through operating charges alone and for no other purpose whatsoever.
These expenses for the first Control Period will be fixed on the basis of the information filed by SLDC and accepted by the Commission. Thereafter, these will be fixed as per the norms to be determined by the Commission.
All other expenses, not covered by Capital cost, Employee cost, Administration and General Expenses or Repairs & Maintenance expenses shall fall under this category of expenses. The SLDC shall file the details of such expenses, if any, at the time of its filings for the purpose of fixation of charges.
Annual Operating charges
Operating Charges (Rs/MW/pm)
=
Total Generation Capacity (MW) x 12
Provided that in case where the usage of intra-state transmission system commences after the 10th of April or the 10th October of a year, the fee for the period up to 30th September of the year and 31st March of the subsequent year respectively shall be required to be paid before the commencement of intra-state transmission.
The Commission shall have the right to use the information submitted by the SLDC as it deems fit including publishing it or placing it on the Commission's website and/or directing the SLDC to display the information on the SLDC’s website / APTRANSCO’s website.
10. POWER TO AMEND
The Commission may, at any time add, vary, alter, modify or amend any provisions of this Regulation.
11. SAVINGS
11.1 Nothing in this Regulation shall be deemed to limit or otherwise affect the inherent power of the Commission to make such orders as may be necessary to meet the ends of justice or to prevent abuse of the process of the Commission.
11.2 Nothing in this Regulation shall bar the Commission from adopting in conformity with the provisions of the Electricity Act 2003, a procedure, which is at variance with any of the provisions of this Regulation, if the Commission, in view of the special circumstances of a matter or class of matters and for reasons to be recorded in writing, deems it necessary or expedient for dealing with such a matter or class of matters.
(By the order of the Commission)
S.SURYA PRAKASA RAO
Annexure – A
(for Generating Companies)
Format of Application for Registration with SLDC as user of intra-state Transmission System
|
Name of the Generating Company |
: |
|
|
Address of the Generating Company
|
: |
|
|
Location of the Generating Station
|
: |
|
|
Location of Interface with Grid (Enclose a layout of switch yard)
|
: |
|
|
Total Installed capacity
|
: |
|
|
COD of the Generating station
|
: |
|
|
Nature of use of Energy |
: |
Supply to Licensees / wheeling to 3rd parties / wheeling for captive use
|
|
Transmission capacity contracted as on (Please enclose details of Licensees) |
: |
|
|
For supply to Licensees |
: |
|
|
For wheeling to 3rd parties
|
: |
|
|
For wheeling for captive use |
: |
|
|
Agreement period for supply to licensees |
: |
|
|
Details of communication system installed for communication of data to SLDC |
: |
|
|
Establishment in-charge of control room for communication with SLDC |
: |
|
|
Details of Registration fee paid |
: |
|
|
Any other information useful for assisting efficient Grid Operation |
: |
|
|
|
|
|
Signature of the Authorized Officer
(For Distribution Licensees / Electricity Traders)
|
Format of Application for Registration with SLDC as user of intra-state Transmission System
| ||
|
|
|
|
|
Name of the Distribution Licensee / Electricity Trader |
: |
|
|
|
|
|
|
|
|
|
|
Address of the Distribution Licensee / Electricity Trader |
: |
|
|
|
|
|
|
|
|
|
|
Location of Interface with Grid |
: |
|
|
(Attach a list of voltage-wise Grid substations/lines along with details of location, capacity, No. of bays, line length, type of line, date of commissioning etc. ) |
|
|
|
|
|
|
|
|
|
|
|
Total capacity (Max. Demand that can be served) |
: |
|
|
|
|
|
|
|
|
|
|
Transmission capacity contracted from Transmission Licensees |
: |
|
|
(enclose list of Transmission Licensees with details) |
|
|
|
|
|
|
|
|
|
|
|
Capacity contracted to Open Access consumers |
: |
|
|
(Enclose list of consumers with details) |
|
|
|
|
|
|
|
|
|
|
|
Details of communication system available for communication of data to SLDC |
: |
|
|
(Enclose substation-wise details) |
|
|
|
|
|
|
|
|
|
|
|
Designation of the personnel responsible for operation of Grid substations |
: |
|
|
(Enclose substation-wise details) |
|
|
|
|
|
|
|
|
|
|
|
Details of the registration fee paid |
|
|
|
|
|
|
|
Any other information useful for assisting efficient Grid Operation: |
|
|
Signature of the Authorized Officer